Página principal Asebal
  Asebal Presentation
  • Welcome
  • Presentation
  • Quality and Environment
  •   Product Catalogues
      Download Catalogues
      Contact
      Location

    User´s Zone

    Email:
    Password:
        
    Register

      Legal Notice
      You´re in: Product Catalogues -> Motorcyclist Protection System-> SCCM-CE system: Installation of the Complete   System

        • Fitting the motorcycle rail.
    8. Attach the motorcycle rail to the mounting bracket assembly using a M16x40 mushroom headed bolt with nut and washer.

    9. Join one length of motorcycle rail to another using six M16x30 mushroom headed bolts with nuts and washers, overlapping the two in such a manner that no leading edges face the flow of traffic.

    10. Align and adjust the height of the motorcycle rail, and establish the tightening torque of the bolts. Remember that the lower edge of the rail should be 3 cm. from the ground.


    << Back
    Next >>
    Polígono Industrial Usila. Calle 1- Parcela 4 Naves 1 y 2. 48490 Ugao-Miraballes (Vizcaya). Tfno: 94.632.22.02 Fax: 94.648.26.00