Página principal Asebal
  Asebal Presentation
  • Welcome
  • Presentation
  • Quality and Environment
  •   Product Catalogues
      Download Catalogues
      Contact
      Location

    User´s Zone

    Email:
    Password:
        
    Register

      Legal Notice
      You´re in: Product Catalogues -> Motorcyclist Protection System-> SCCM-CE system: Installation of the Complete   System

        • Fitting of the mounting bracket to the spacer.

    4. Position the mounting
    bracket on the spacer.
    Remember that the shape
    of the mounting bracket
    varies depending on whether
    the barrier is on the right
    or left hand side.
        • Fitting of the w-beam guardrail.
    5. Attach the barrier, the light reflector and the mounting bracket to the spacer with a M16x40 mushroom headed bolt with nut and washer.

    6. Join one length of barrier to another using eight M16x30 mushroom headed bolts with nuts and washers, overlapping the two in such a manner that no leading edges face the flow of traffic.

    7. Align and adjust the height of the barrier, and establish the tightening torque of the bolts. Remember that the upper part of the barrier should be between 70 and 75 cm. from the ground.

    << Back
    Next >>

    Polígono Industrial Usila. Calle 1- Parcela 4 Naves 1 y 2. 48490 Ugao-Miraballes (Vizcaya). Tfno: 94.632.22.02 Fax: 94.648.26.00