Página principal Asebal
  Asebal Presentation
  • Welcome
  • Presentation
  • Quality and Environment
  •   Product Catalogues
      Download Catalogues
      Contact
      Location

    User´s Zone

    Email:
    Password:
        
    Register

      Legal Notice
      You´re in: Product Catalogues -> Motorcyclist Protection System-> SCCM-CE system: Installation of the Complete   System

    4.2. Installation Sheets
    4.2.1. Installation of the Complete System.
    Start installing the BMSNA4/120a protection system as described in Standard UNE-135124. The only difference is that when the spacer is being bolted to the guardrail a special mounting bracket is slid between these two components to allow attachment of the motorcycle guardrail. the motorcycle
    guardrail.
        Stage by stage description of the installation process:
        • Driving of posts and positioning of spacers.
    1. The barrier is laid out on the ground and aligned to determine where the posts are to be driven.

    2. Post “C” is driven into the ground, taking care to ensure that its final height is correct.

    3. A standard spacer is attached to post “C” using three M16x35 hex bolts with nuts and washers.

    << Back
    Next >>
    Polígono Industrial Usila. Calle 1- Parcela 4 Naves 1 y 2. 48490 Ugao-Miraballes (Vizcaya). Tfno: 94.632.22.02 Fax: 94.648.26.00